Files
roa2web-service-auto/docs/PRODUCTION_CHECKLIST.md
Marius Mutu 6b13ffa183 Initial commit: ROA2WEB - FastAPI + Vue.js + Telegram Bot
Modern ERP Reports Application with microservices architecture

Tech Stack:
- Backend: FastAPI + python-oracledb (Oracle DB integration)
- Frontend: Vue.js 3 + PrimeVue + Vite
- Telegram Bot: python-telegram-bot + SQLite
- Infrastructure: Shared database pool, JWT authentication, SSH tunnel

Features:
- FastAPI backend with async Oracle connection pool
- Vue.js 3 responsive frontend with PrimeVue components
- Telegram bot alternative interface
- Microservices architecture with shared components
- Complete deployment support (Linux Docker + Windows IIS)
- Comprehensive testing (Playwright E2E + pytest)

Repository Structure:
- reports-app/ - Main application (backend, frontend, telegram-bot)
- shared/ - Shared components (database pool, auth, utils)
- deployment/ - Deployment scripts (Linux & Windows)
- docs/ - Project documentation
- security/ - Security scanning and git hooks
2025-10-25 14:55:08 +03:00

345 lines
11 KiB
Markdown

# ROA2WEB Production Go-Live Checklist
This checklist ensures a smooth production deployment and covers all critical aspects of going live with ROA2WEB.
## 🎯 Pre-Go-Live Checklist (1-2 weeks before)
### Infrastructure Setup ✅
#### Server Requirements
- [ ] Production server provisioned (4GB+ RAM, 20GB+ disk, 2+ CPU cores)
- [ ] Server OS updated and hardened (Ubuntu 20.04+ or similar)
- [ ] SSH key-based authentication configured
- [ ] Non-root user with sudo privileges created
- [ ] Firewall configured (UFW/iptables) - only required ports open
- [ ] Backup server/storage configured
- [ ] Monitoring tools installed (htop, curl, etc.)
#### Network and DNS
- [ ] Domain name registered and configured
- [ ] DNS A record pointing to production server IP
- [ ] SSL certificate planning (Let's Encrypt or custom)
- [ ] CDN configuration (if using CloudFlare/AWS CloudFront)
- [ ] Load balancer setup (if using multiple servers)
#### Database Setup
- [ ] Oracle database connection tested from production server
- [ ] SSH tunnel configured and tested (if required)
- [ ] Database user permissions verified
- [ ] Database backup strategy implemented
- [ ] Connection pooling settings optimized
### Application Configuration ✅
#### Environment Configuration
- [ ] `.env.production` file created with production values
- [ ] All environment variables validated
- [ ] Secrets management configured (Docker secrets)
- [ ] SSL email address configured for Let's Encrypt
- [ ] JWT secret keys generated (strong, unique)
- [ ] Redis password configured
#### Security Configuration
- [ ] HTTPS enforced (HTTP redirects to HTTPS)
- [ ] Security headers configured in Nginx
- [ ] CORS settings reviewed and configured
- [ ] API rate limiting configured
- [ ] File upload restrictions in place
- [ ] Database connection encryption enabled
#### Performance Configuration
- [ ] Worker processes optimized for server resources
- [ ] Connection pools sized appropriately
- [ ] Caching strategy implemented (Redis)
- [ ] Static file caching configured
- [ ] Gzip compression enabled
- [ ] Image optimization configured
### Docker and Deployment ✅
#### Docker Setup
- [ ] Docker and Docker Compose installed (latest stable versions)
- [ ] Docker daemon configured for production
- [ ] Docker log rotation configured
- [ ] Docker registry access configured (if using private registry)
- [ ] Multi-stage Dockerfiles optimized
- [ ] Health checks configured for all services
#### Deployment Pipeline
- [ ] Deployment scripts tested (`deploy.sh`, `backup.sh`, `rollback.sh`)
- [ ] Automated deployment pipeline configured (CI/CD)
- [ ] Blue-green or rolling deployment strategy implemented
- [ ] Rollback procedures tested
- [ ] Zero-downtime deployment verified
## 🚀 Deployment Day Checklist
### Pre-Deployment (Morning) ✅
#### Final Preparations
- [ ] All team members notified of deployment schedule
- [ ] Maintenance window scheduled and communicated
- [ ] Rollback plan reviewed and understood by team
- [ ] Emergency contacts list updated
- [ ] Backup of current system created
- [ ] Database maintenance mode enabled (if required)
#### Last-Minute Verifications
- [ ] Latest code pulled from main branch
- [ ] All tests passing in CI/CD pipeline
- [ ] Production configuration files reviewed
- [ ] SSL certificates validated
- [ ] DNS propagation confirmed
- [ ] Third-party service integrations tested
### Deployment Execution ✅
#### Step 1: Infrastructure
- [ ] Server resources verified (CPU, Memory, Disk)
- [ ] Network connectivity confirmed
- [ ] Database connectivity tested
- [ ] SSH tunnel established (if required)
- [ ] Firewall rules validated
#### Step 2: Application Deployment
- [ ] Environment variables loaded
- [ ] Docker images built successfully
- [ ] Services started in correct order
- [ ] Health checks passing
- [ ] SSL certificates generated/installed
- [ ] Nginx configuration loaded
#### Step 3: Service Verification
- [ ] All containers running and healthy
- [ ] Frontend accessible via HTTPS
- [ ] Backend API responding correctly
- [ ] Database connections working
- [ ] Redis caching operational
- [ ] Log files being generated
### Post-Deployment Verification ✅
#### Functional Testing
- [ ] User authentication working
- [ ] Main application features functional
- [ ] Report generation working
- [ ] File uploads/downloads working
- [ ] Email notifications working (if applicable)
- [ ] Search functionality working
#### Performance Testing
- [ ] Page load times acceptable (<3 seconds)
- [ ] API response times acceptable (<500ms)
- [ ] Database query performance acceptable
- [ ] Memory usage within limits
- [ ] CPU usage within limits
- [ ] No memory leaks detected
#### Security Testing
- [ ] HTTPS enforced (HTTP redirects work)
- [ ] Security headers present in responses
- [ ] No sensitive data exposed in logs
- [ ] Authentication/authorization working
- [ ] XSS/CSRF protections active
- [ ] File upload restrictions working
## 🔍 Go-Live Monitoring (First 24 Hours)
### Immediate Monitoring (First Hour) ✅
#### System Health
- [ ] All services running (docker-compose ps)
- [ ] Health checks passing (`./scripts/health-check.sh`)
- [ ] No error messages in logs
- [ ] Resource usage normal
- [ ] SSL certificate working
- [ ] DNS resolution working
#### Application Health
- [ ] Login functionality working
- [ ] User sessions persistent
- [ ] Database queries executing normally
- [ ] No 500/404 errors
- [ ] Static files loading correctly
- [ ] API endpoints responding
### Extended Monitoring (First 24 Hours) ✅
#### Performance Monitoring
- [ ] Response times remain stable
- [ ] Memory usage stable (no leaks)
- [ ] CPU usage within expected range
- [ ] Disk usage not growing abnormally
- [ ] Database connection pool healthy
- [ ] No timeout errors
#### Error Monitoring
- [ ] Application error logs reviewed every 4 hours
- [ ] Server error logs reviewed every 4 hours
- [ ] No critical errors in database logs
- [ ] No failed authentication attempts (beyond normal)
- [ ] No security-related warnings
#### User Experience
- [ ] User feedback collected and reviewed
- [ ] No user-reported issues
- [ ] Performance meets user expectations
- [ ] All features accessible to users
- [ ] Mobile responsiveness working
## 🚨 Issue Response Procedures
### Severity 1 - Critical (Service Down)
**Response Time: Immediate**
- [ ] Execute emergency procedures
- [ ] Notify all stakeholders immediately
- [ ] Assess if rollback is needed
- [ ] Document all actions taken
- [ ] Implement fix or rollback within 30 minutes
**Emergency Rollback:**
```bash
./scripts/rollback.sh emergency
./scripts/rollback.sh quick
```
### Severity 2 - High (Performance Issues)
**Response Time: Within 1 Hour**
- [ ] Investigate root cause
- [ ] Implement temporary workaround if possible
- [ ] Plan permanent fix
- [ ] Monitor system closely
- [ ] Update stakeholders every hour
### Severity 3 - Medium (Minor Issues)
**Response Time: Within 4 Hours**
- [ ] Log issue in tracking system
- [ ] Investigate when resources available
- [ ] Plan fix for next maintenance window
- [ ] Monitor for escalation
## 📊 Success Metrics
### Technical Metrics ✅
- [ ] Uptime > 99.9% in first 24 hours
- [ ] Average response time < 500ms
- [ ] Error rate < 0.1%
- [ ] Zero security incidents
- [ ] Zero data loss events
- [ ] Successful SSL certificate installation
### Business Metrics ✅
- [ ] Users can successfully log in
- [ ] Core functionality available
- [ ] Reports generate correctly
- [ ] No user-blocking issues
- [ ] Positive user feedback
- [ ] Go-live objectives met
## 📞 Communication Plan
### Stakeholder Notifications ✅
#### Pre-Go-Live (24 hours before)
- [ ] Send deployment schedule to all stakeholders
- [ ] Confirm maintenance window (if applicable)
- [ ] Provide rollback timeline
- [ ] Share emergency contact information
#### Go-Live Day
- [ ] **Deployment Start**: Notify start of deployment
- [ ] **Major Milestones**: Update on key deployment steps
- [ ] **Issues**: Immediate notification of any problems
- [ ] **Completion**: Confirmation of successful deployment
- [ ] **Post-Go-Live**: 24-hour status update
#### Emergency Communications
- [ ] **Severity 1**: Immediate email/SMS to all stakeholders
- [ ] **Rollback Decision**: Immediate notification with timeline
- [ ] **Resolution**: Update when issue resolved
### Contact Information ✅
- [ ] Primary deployment engineer: [Name/Phone/Email]
- [ ] Backup deployment engineer: [Name/Phone/Email]
- [ ] Database administrator: [Name/Phone/Email]
- [ ] Infrastructure team: [Name/Phone/Email]
- [ ] Business stakeholders: [Names/Emails]
## 🔄 Post-Go-Live Activities (Week 1)
### Daily Reviews (Days 1-7) ✅
- [ ] **Day 1**: Full system review and user feedback collection
- [ ] **Day 2**: Performance analysis and optimization
- [ ] **Day 3**: Security review and log analysis
- [ ] **Day 4**: User experience review and minor fixes
- [ ] **Day 5**: Backup and disaster recovery testing
- [ ] **Day 6**: Documentation updates and lessons learned
- [ ] **Day 7**: Weekly review and planning next steps
### Documentation Updates ✅
- [ ] Update production runbooks
- [ ] Document any configuration changes
- [ ] Update troubleshooting guides
- [ ] Record lessons learned
- [ ] Update emergency procedures
- [ ] Create post-mortem report (if issues occurred)
### Optimization Activities ✅
- [ ] Review and optimize performance bottlenecks
- [ ] Adjust resource allocations based on actual usage
- [ ] Fine-tune caching configurations
- [ ] Optimize database queries if needed
- [ ] Update monitoring thresholds
- [ ] Plan capacity scaling if needed
## ✅ Final Checklist Completion
### Deployment Team Sign-off ✅
- [ ] **Lead Developer**: System functionality verified
- [ ] **DevOps Engineer**: Infrastructure and deployment verified
- [ ] **DBA**: Database operations verified
- [ ] **Security Officer**: Security measures verified
- [ ] **QA Lead**: Quality assurance verified
- [ ] **Project Manager**: Go-live objectives met
### Business Team Sign-off ✅
- [ ] **Business Owner**: Business requirements met
- [ ] **End Users**: User acceptance confirmed
- [ ] **Support Team**: Support procedures ready
- [ ] **Management**: Go-live approved and successful
---
## 📋 Quick Reference Commands
```bash
# Health Check
./scripts/health-check.sh full
# Emergency Stop
./scripts/rollback.sh emergency
# Quick Rollback
./scripts/rollback.sh quick
# View Logs
docker-compose logs -f
# Check Services
docker-compose ps
# System Resources
docker stats
htop
df -h
```
---
**🎉 Congratulations on your successful ROA2WEB production deployment!**
*Production Go-Live Checklist v1.0*
*Last updated: $(date +%Y-%m-%d)*