Modern ERP Reports Application with microservices architecture Tech Stack: - Backend: FastAPI + python-oracledb (Oracle DB integration) - Frontend: Vue.js 3 + PrimeVue + Vite - Telegram Bot: python-telegram-bot + SQLite - Infrastructure: Shared database pool, JWT authentication, SSH tunnel Features: - FastAPI backend with async Oracle connection pool - Vue.js 3 responsive frontend with PrimeVue components - Telegram bot alternative interface - Microservices architecture with shared components - Complete deployment support (Linux Docker + Windows IIS) - Comprehensive testing (Playwright E2E + pytest) Repository Structure: - reports-app/ - Main application (backend, frontend, telegram-bot) - shared/ - Shared components (database pool, auth, utils) - deployment/ - Deployment scripts (Linux & Windows) - docs/ - Project documentation - security/ - Security scanning and git hooks
11 KiB
11 KiB
ROA2WEB Production Go-Live Checklist
This checklist ensures a smooth production deployment and covers all critical aspects of going live with ROA2WEB.
🎯 Pre-Go-Live Checklist (1-2 weeks before)
Infrastructure Setup ✅
Server Requirements
- Production server provisioned (4GB+ RAM, 20GB+ disk, 2+ CPU cores)
- Server OS updated and hardened (Ubuntu 20.04+ or similar)
- SSH key-based authentication configured
- Non-root user with sudo privileges created
- Firewall configured (UFW/iptables) - only required ports open
- Backup server/storage configured
- Monitoring tools installed (htop, curl, etc.)
Network and DNS
- Domain name registered and configured
- DNS A record pointing to production server IP
- SSL certificate planning (Let's Encrypt or custom)
- CDN configuration (if using CloudFlare/AWS CloudFront)
- Load balancer setup (if using multiple servers)
Database Setup
- Oracle database connection tested from production server
- SSH tunnel configured and tested (if required)
- Database user permissions verified
- Database backup strategy implemented
- Connection pooling settings optimized
Application Configuration ✅
Environment Configuration
.env.productionfile created with production values- All environment variables validated
- Secrets management configured (Docker secrets)
- SSL email address configured for Let's Encrypt
- JWT secret keys generated (strong, unique)
- Redis password configured
Security Configuration
- HTTPS enforced (HTTP redirects to HTTPS)
- Security headers configured in Nginx
- CORS settings reviewed and configured
- API rate limiting configured
- File upload restrictions in place
- Database connection encryption enabled
Performance Configuration
- Worker processes optimized for server resources
- Connection pools sized appropriately
- Caching strategy implemented (Redis)
- Static file caching configured
- Gzip compression enabled
- Image optimization configured
Docker and Deployment ✅
Docker Setup
- Docker and Docker Compose installed (latest stable versions)
- Docker daemon configured for production
- Docker log rotation configured
- Docker registry access configured (if using private registry)
- Multi-stage Dockerfiles optimized
- Health checks configured for all services
Deployment Pipeline
- Deployment scripts tested (
deploy.sh,backup.sh,rollback.sh) - Automated deployment pipeline configured (CI/CD)
- Blue-green or rolling deployment strategy implemented
- Rollback procedures tested
- Zero-downtime deployment verified
🚀 Deployment Day Checklist
Pre-Deployment (Morning) ✅
Final Preparations
- All team members notified of deployment schedule
- Maintenance window scheduled and communicated
- Rollback plan reviewed and understood by team
- Emergency contacts list updated
- Backup of current system created
- Database maintenance mode enabled (if required)
Last-Minute Verifications
- Latest code pulled from main branch
- All tests passing in CI/CD pipeline
- Production configuration files reviewed
- SSL certificates validated
- DNS propagation confirmed
- Third-party service integrations tested
Deployment Execution ✅
Step 1: Infrastructure
- Server resources verified (CPU, Memory, Disk)
- Network connectivity confirmed
- Database connectivity tested
- SSH tunnel established (if required)
- Firewall rules validated
Step 2: Application Deployment
- Environment variables loaded
- Docker images built successfully
- Services started in correct order
- Health checks passing
- SSL certificates generated/installed
- Nginx configuration loaded
Step 3: Service Verification
- All containers running and healthy
- Frontend accessible via HTTPS
- Backend API responding correctly
- Database connections working
- Redis caching operational
- Log files being generated
Post-Deployment Verification ✅
Functional Testing
- User authentication working
- Main application features functional
- Report generation working
- File uploads/downloads working
- Email notifications working (if applicable)
- Search functionality working
Performance Testing
- Page load times acceptable (<3 seconds)
- API response times acceptable (<500ms)
- Database query performance acceptable
- Memory usage within limits
- CPU usage within limits
- No memory leaks detected
Security Testing
- HTTPS enforced (HTTP redirects work)
- Security headers present in responses
- No sensitive data exposed in logs
- Authentication/authorization working
- XSS/CSRF protections active
- File upload restrictions working
🔍 Go-Live Monitoring (First 24 Hours)
Immediate Monitoring (First Hour) ✅
System Health
- All services running (docker-compose ps)
- Health checks passing (
./scripts/health-check.sh) - No error messages in logs
- Resource usage normal
- SSL certificate working
- DNS resolution working
Application Health
- Login functionality working
- User sessions persistent
- Database queries executing normally
- No 500/404 errors
- Static files loading correctly
- API endpoints responding
Extended Monitoring (First 24 Hours) ✅
Performance Monitoring
- Response times remain stable
- Memory usage stable (no leaks)
- CPU usage within expected range
- Disk usage not growing abnormally
- Database connection pool healthy
- No timeout errors
Error Monitoring
- Application error logs reviewed every 4 hours
- Server error logs reviewed every 4 hours
- No critical errors in database logs
- No failed authentication attempts (beyond normal)
- No security-related warnings
User Experience
- User feedback collected and reviewed
- No user-reported issues
- Performance meets user expectations
- All features accessible to users
- Mobile responsiveness working
🚨 Issue Response Procedures
Severity 1 - Critical (Service Down)
Response Time: Immediate
- Execute emergency procedures
- Notify all stakeholders immediately
- Assess if rollback is needed
- Document all actions taken
- Implement fix or rollback within 30 minutes
Emergency Rollback:
./scripts/rollback.sh emergency
./scripts/rollback.sh quick
Severity 2 - High (Performance Issues)
Response Time: Within 1 Hour
- Investigate root cause
- Implement temporary workaround if possible
- Plan permanent fix
- Monitor system closely
- Update stakeholders every hour
Severity 3 - Medium (Minor Issues)
Response Time: Within 4 Hours
- Log issue in tracking system
- Investigate when resources available
- Plan fix for next maintenance window
- Monitor for escalation
📊 Success Metrics
Technical Metrics ✅
- Uptime > 99.9% in first 24 hours
- Average response time < 500ms
- Error rate < 0.1%
- Zero security incidents
- Zero data loss events
- Successful SSL certificate installation
Business Metrics ✅
- Users can successfully log in
- Core functionality available
- Reports generate correctly
- No user-blocking issues
- Positive user feedback
- Go-live objectives met
📞 Communication Plan
Stakeholder Notifications ✅
Pre-Go-Live (24 hours before)
- Send deployment schedule to all stakeholders
- Confirm maintenance window (if applicable)
- Provide rollback timeline
- Share emergency contact information
Go-Live Day
- Deployment Start: Notify start of deployment
- Major Milestones: Update on key deployment steps
- Issues: Immediate notification of any problems
- Completion: Confirmation of successful deployment
- Post-Go-Live: 24-hour status update
Emergency Communications
- Severity 1: Immediate email/SMS to all stakeholders
- Rollback Decision: Immediate notification with timeline
- Resolution: Update when issue resolved
Contact Information ✅
- Primary deployment engineer: [Name/Phone/Email]
- Backup deployment engineer: [Name/Phone/Email]
- Database administrator: [Name/Phone/Email]
- Infrastructure team: [Name/Phone/Email]
- Business stakeholders: [Names/Emails]
🔄 Post-Go-Live Activities (Week 1)
Daily Reviews (Days 1-7) ✅
- Day 1: Full system review and user feedback collection
- Day 2: Performance analysis and optimization
- Day 3: Security review and log analysis
- Day 4: User experience review and minor fixes
- Day 5: Backup and disaster recovery testing
- Day 6: Documentation updates and lessons learned
- Day 7: Weekly review and planning next steps
Documentation Updates ✅
- Update production runbooks
- Document any configuration changes
- Update troubleshooting guides
- Record lessons learned
- Update emergency procedures
- Create post-mortem report (if issues occurred)
Optimization Activities ✅
- Review and optimize performance bottlenecks
- Adjust resource allocations based on actual usage
- Fine-tune caching configurations
- Optimize database queries if needed
- Update monitoring thresholds
- Plan capacity scaling if needed
✅ Final Checklist Completion
Deployment Team Sign-off ✅
- Lead Developer: System functionality verified
- DevOps Engineer: Infrastructure and deployment verified
- DBA: Database operations verified
- Security Officer: Security measures verified
- QA Lead: Quality assurance verified
- Project Manager: Go-live objectives met
Business Team Sign-off ✅
- Business Owner: Business requirements met
- End Users: User acceptance confirmed
- Support Team: Support procedures ready
- Management: Go-live approved and successful
📋 Quick Reference Commands
# Health Check
./scripts/health-check.sh full
# Emergency Stop
./scripts/rollback.sh emergency
# Quick Rollback
./scripts/rollback.sh quick
# View Logs
docker-compose logs -f
# Check Services
docker-compose ps
# System Resources
docker stats
htop
df -h
🎉 Congratulations on your successful ROA2WEB production deployment!
Production Go-Live Checklist v1.0
Last updated: $(date +%Y-%m-%d)