Files
roa2web-service-auto/docs/PRODUCTION_CHECKLIST.md
Marius Mutu 6b13ffa183 Initial commit: ROA2WEB - FastAPI + Vue.js + Telegram Bot
Modern ERP Reports Application with microservices architecture

Tech Stack:
- Backend: FastAPI + python-oracledb (Oracle DB integration)
- Frontend: Vue.js 3 + PrimeVue + Vite
- Telegram Bot: python-telegram-bot + SQLite
- Infrastructure: Shared database pool, JWT authentication, SSH tunnel

Features:
- FastAPI backend with async Oracle connection pool
- Vue.js 3 responsive frontend with PrimeVue components
- Telegram bot alternative interface
- Microservices architecture with shared components
- Complete deployment support (Linux Docker + Windows IIS)
- Comprehensive testing (Playwright E2E + pytest)

Repository Structure:
- reports-app/ - Main application (backend, frontend, telegram-bot)
- shared/ - Shared components (database pool, auth, utils)
- deployment/ - Deployment scripts (Linux & Windows)
- docs/ - Project documentation
- security/ - Security scanning and git hooks
2025-10-25 14:55:08 +03:00

11 KiB

ROA2WEB Production Go-Live Checklist

This checklist ensures a smooth production deployment and covers all critical aspects of going live with ROA2WEB.

🎯 Pre-Go-Live Checklist (1-2 weeks before)

Infrastructure Setup

Server Requirements

  • Production server provisioned (4GB+ RAM, 20GB+ disk, 2+ CPU cores)
  • Server OS updated and hardened (Ubuntu 20.04+ or similar)
  • SSH key-based authentication configured
  • Non-root user with sudo privileges created
  • Firewall configured (UFW/iptables) - only required ports open
  • Backup server/storage configured
  • Monitoring tools installed (htop, curl, etc.)

Network and DNS

  • Domain name registered and configured
  • DNS A record pointing to production server IP
  • SSL certificate planning (Let's Encrypt or custom)
  • CDN configuration (if using CloudFlare/AWS CloudFront)
  • Load balancer setup (if using multiple servers)

Database Setup

  • Oracle database connection tested from production server
  • SSH tunnel configured and tested (if required)
  • Database user permissions verified
  • Database backup strategy implemented
  • Connection pooling settings optimized

Application Configuration

Environment Configuration

  • .env.production file created with production values
  • All environment variables validated
  • Secrets management configured (Docker secrets)
  • SSL email address configured for Let's Encrypt
  • JWT secret keys generated (strong, unique)
  • Redis password configured

Security Configuration

  • HTTPS enforced (HTTP redirects to HTTPS)
  • Security headers configured in Nginx
  • CORS settings reviewed and configured
  • API rate limiting configured
  • File upload restrictions in place
  • Database connection encryption enabled

Performance Configuration

  • Worker processes optimized for server resources
  • Connection pools sized appropriately
  • Caching strategy implemented (Redis)
  • Static file caching configured
  • Gzip compression enabled
  • Image optimization configured

Docker and Deployment

Docker Setup

  • Docker and Docker Compose installed (latest stable versions)
  • Docker daemon configured for production
  • Docker log rotation configured
  • Docker registry access configured (if using private registry)
  • Multi-stage Dockerfiles optimized
  • Health checks configured for all services

Deployment Pipeline

  • Deployment scripts tested (deploy.sh, backup.sh, rollback.sh)
  • Automated deployment pipeline configured (CI/CD)
  • Blue-green or rolling deployment strategy implemented
  • Rollback procedures tested
  • Zero-downtime deployment verified

🚀 Deployment Day Checklist

Pre-Deployment (Morning)

Final Preparations

  • All team members notified of deployment schedule
  • Maintenance window scheduled and communicated
  • Rollback plan reviewed and understood by team
  • Emergency contacts list updated
  • Backup of current system created
  • Database maintenance mode enabled (if required)

Last-Minute Verifications

  • Latest code pulled from main branch
  • All tests passing in CI/CD pipeline
  • Production configuration files reviewed
  • SSL certificates validated
  • DNS propagation confirmed
  • Third-party service integrations tested

Deployment Execution

Step 1: Infrastructure

  • Server resources verified (CPU, Memory, Disk)
  • Network connectivity confirmed
  • Database connectivity tested
  • SSH tunnel established (if required)
  • Firewall rules validated

Step 2: Application Deployment

  • Environment variables loaded
  • Docker images built successfully
  • Services started in correct order
  • Health checks passing
  • SSL certificates generated/installed
  • Nginx configuration loaded

Step 3: Service Verification

  • All containers running and healthy
  • Frontend accessible via HTTPS
  • Backend API responding correctly
  • Database connections working
  • Redis caching operational
  • Log files being generated

Post-Deployment Verification

Functional Testing

  • User authentication working
  • Main application features functional
  • Report generation working
  • File uploads/downloads working
  • Email notifications working (if applicable)
  • Search functionality working

Performance Testing

  • Page load times acceptable (<3 seconds)
  • API response times acceptable (<500ms)
  • Database query performance acceptable
  • Memory usage within limits
  • CPU usage within limits
  • No memory leaks detected

Security Testing

  • HTTPS enforced (HTTP redirects work)
  • Security headers present in responses
  • No sensitive data exposed in logs
  • Authentication/authorization working
  • XSS/CSRF protections active
  • File upload restrictions working

🔍 Go-Live Monitoring (First 24 Hours)

Immediate Monitoring (First Hour)

System Health

  • All services running (docker-compose ps)
  • Health checks passing (./scripts/health-check.sh)
  • No error messages in logs
  • Resource usage normal
  • SSL certificate working
  • DNS resolution working

Application Health

  • Login functionality working
  • User sessions persistent
  • Database queries executing normally
  • No 500/404 errors
  • Static files loading correctly
  • API endpoints responding

Extended Monitoring (First 24 Hours)

Performance Monitoring

  • Response times remain stable
  • Memory usage stable (no leaks)
  • CPU usage within expected range
  • Disk usage not growing abnormally
  • Database connection pool healthy
  • No timeout errors

Error Monitoring

  • Application error logs reviewed every 4 hours
  • Server error logs reviewed every 4 hours
  • No critical errors in database logs
  • No failed authentication attempts (beyond normal)
  • No security-related warnings

User Experience

  • User feedback collected and reviewed
  • No user-reported issues
  • Performance meets user expectations
  • All features accessible to users
  • Mobile responsiveness working

🚨 Issue Response Procedures

Severity 1 - Critical (Service Down)

Response Time: Immediate

  • Execute emergency procedures
  • Notify all stakeholders immediately
  • Assess if rollback is needed
  • Document all actions taken
  • Implement fix or rollback within 30 minutes

Emergency Rollback:

./scripts/rollback.sh emergency
./scripts/rollback.sh quick

Severity 2 - High (Performance Issues)

Response Time: Within 1 Hour

  • Investigate root cause
  • Implement temporary workaround if possible
  • Plan permanent fix
  • Monitor system closely
  • Update stakeholders every hour

Severity 3 - Medium (Minor Issues)

Response Time: Within 4 Hours

  • Log issue in tracking system
  • Investigate when resources available
  • Plan fix for next maintenance window
  • Monitor for escalation

📊 Success Metrics

Technical Metrics

  • Uptime > 99.9% in first 24 hours
  • Average response time < 500ms
  • Error rate < 0.1%
  • Zero security incidents
  • Zero data loss events
  • Successful SSL certificate installation

Business Metrics

  • Users can successfully log in
  • Core functionality available
  • Reports generate correctly
  • No user-blocking issues
  • Positive user feedback
  • Go-live objectives met

📞 Communication Plan

Stakeholder Notifications

Pre-Go-Live (24 hours before)

  • Send deployment schedule to all stakeholders
  • Confirm maintenance window (if applicable)
  • Provide rollback timeline
  • Share emergency contact information

Go-Live Day

  • Deployment Start: Notify start of deployment
  • Major Milestones: Update on key deployment steps
  • Issues: Immediate notification of any problems
  • Completion: Confirmation of successful deployment
  • Post-Go-Live: 24-hour status update

Emergency Communications

  • Severity 1: Immediate email/SMS to all stakeholders
  • Rollback Decision: Immediate notification with timeline
  • Resolution: Update when issue resolved

Contact Information

  • Primary deployment engineer: [Name/Phone/Email]
  • Backup deployment engineer: [Name/Phone/Email]
  • Database administrator: [Name/Phone/Email]
  • Infrastructure team: [Name/Phone/Email]
  • Business stakeholders: [Names/Emails]

🔄 Post-Go-Live Activities (Week 1)

Daily Reviews (Days 1-7)

  • Day 1: Full system review and user feedback collection
  • Day 2: Performance analysis and optimization
  • Day 3: Security review and log analysis
  • Day 4: User experience review and minor fixes
  • Day 5: Backup and disaster recovery testing
  • Day 6: Documentation updates and lessons learned
  • Day 7: Weekly review and planning next steps

Documentation Updates

  • Update production runbooks
  • Document any configuration changes
  • Update troubleshooting guides
  • Record lessons learned
  • Update emergency procedures
  • Create post-mortem report (if issues occurred)

Optimization Activities

  • Review and optimize performance bottlenecks
  • Adjust resource allocations based on actual usage
  • Fine-tune caching configurations
  • Optimize database queries if needed
  • Update monitoring thresholds
  • Plan capacity scaling if needed

Final Checklist Completion

Deployment Team Sign-off

  • Lead Developer: System functionality verified
  • DevOps Engineer: Infrastructure and deployment verified
  • DBA: Database operations verified
  • Security Officer: Security measures verified
  • QA Lead: Quality assurance verified
  • Project Manager: Go-live objectives met

Business Team Sign-off

  • Business Owner: Business requirements met
  • End Users: User acceptance confirmed
  • Support Team: Support procedures ready
  • Management: Go-live approved and successful

📋 Quick Reference Commands

# Health Check
./scripts/health-check.sh full

# Emergency Stop
./scripts/rollback.sh emergency

# Quick Rollback
./scripts/rollback.sh quick

# View Logs
docker-compose logs -f

# Check Services
docker-compose ps

# System Resources
docker stats
htop
df -h

🎉 Congratulations on your successful ROA2WEB production deployment!

Production Go-Live Checklist v1.0
Last updated: $(date +%Y-%m-%d)